Deer Hollow at East Lake

Wind Mitigation Reports

This page was last updated on: May 2, 2019 by Brad Neff. Uploaded corrected Report for Building 230, added 4 new roofs replaced in 2019, and updated 22 Mitigation Reports. Also uploaded the Master Mitigation Report with Aerial Photographs and Inspectors Certifications and other details.
The Reports are Listed by ascending Building Number from Building 201 to Building 230 and the Clubhouse.
The Dates in the Left Column indicate the Date that new roofs were last installed on each building.
The Dates in the Right Column indicate the Date of the last Wind Mitigation Inspection & Report*
*This verification form is valid for up to five (5) years provided no material changes have been made to the structure or inaccuracies found on the form.
 
Master Mitigation Report with Aerials, etc.  This is a very large and slow loading report
Building 201 2019 - 2019
Building 202 1998 - 2019
Building 203 2013 - 2019
Building 204 2000 - 2019
Building 205 2000 - 2019
Building 206 2000 - 2019
Building 207 1999 - 2019
Building 208 1999 - 2019
Building 209 2013 - 2019
Building 210 2017 - 2017
Building 211 2019 - 2019
Building 212 2000 - 2019
Building 213 1998 - 2019
Building 214 2000 - 2019
Building 215 2016 - 2016
Building 216 2014 - 2019
Building 217 2014 - 2019
Building 218 2014 - 2019
Building 219 2014 - 2019
Building 220 2014 - 2019
Building 221 2015 - 2015
Building 222 1996 - 2019
Building 223 2018 - 2018
Building 224 2015 - 2015
Building 225 2017 - 2017
Building 226 2014 - 2019
Building 227 2014 - 2019
Building 228 2018 - 2018 
Building 229 2018 - 2018 
Building 230 2019 - 2019
Clubhouse    2019 - 2019