Deer Hollow at East Lake

Wind Mitigation Reports

This page was last updated on: April 21, 2020 by Brad Neff. Uploaded new Reports for Buildings 212, 213 and 214 new roofs replaced in 2020.
The Reports are Listed by ascending Building Number from Building 201 to Building 230 and the Clubhouse.
The Dates in the Left Column indicate the Date that new roofs were last installed on each building.
The Dates in the Right Column indicate the Date of the last Wind Mitigation Inspection & Report*
*The Mitigation Report Forms are valid for up to five (5) years provided no material changes have been made to the structure or inaccuracies found on the form.
 
Master Mitigation Report with Aerials, etc.  This is a very large and slow loading report
Building 201 2024 - 2029
Building 202 2021 - 2023
Building 203 2024 - 2029
Building 204 2022 - 2027
Building 205 2022 - 2027
Building 206 2023 - 2028
Building 207 2023 - 2028
Building 208 2022 - 2027
Building 209 2024 - 2029
Building 210 2021 - 2023
Building 211 2024 - 2029
Building 212 2020 - 2020
Building 213 2020 - 2020
Building 214 2020 - 2020
Building 215 2021 - 2023
Building 216 2024 - 2029
Building 217 2024 - 2029
Building 218 2024 - 2029
Building 219 2024 - 2029
Building 220 2024 - 2029
Building 221 2021 - 2023
Building 222 2021 - 2023
Building 223 2024 - 2029
Building 224 2021 - 2023
Building 225 2021 - 2023
Building 226 2023 - 2028
Building 227 2021 - 2023
Building 228 2024 - 2029
Building 229 2024 - 2029 
Building 230 2024 - 2029
Clubhouse    2024 - 2029
Work Shed   2024 - 2029